Raymond Terrace Waste Water Treatment Plant Sheet Piling for circular cofferdam. 33 meters in diameter, sheet length of 10 meters |
![]() |
Commercial Units in Avalon 3 level basement carpark 285 Sheet Piles at 13m depth Pre-drilling was required due to ground conditions of medium strength sandstone |
![]() |
Airly Coal Mine Trunk Conveyor and Fan Ventilation works Excavation, Bored Piers (750 - 300 diam to 9m depth), Pile Caps and civil |
![]() |
Shell Hexham Tank Farm Contiguous CFA wall (300 diam to 12m depth) and capping beam Ground was water charged alluvial mud |
![]() |
Moolarben Coal Mine Transfer Towers & Conveyors Excavation, Bored Piers (900 - 450 diam to 12m depth) and Pile Caps |
![]() |
Caltex Charmhaven Tank Farm Sheet Piling, Whalers and Anchor Piers. Sheets at 10m depth. Ground was water charged |
![]() |
Caltex Charmhaven Tank Farm Sheet Piling, Whalers and Anchor Piers. Sheets at 10m depth. Ground was water charged |
Nelson Bay Retaining Wall Sheet Piling. Sheets at 8m depth |
![]() |
Energy Australia Substation, Tomago Power Poles Bored Piers (sleeved). 900 diam to 6m depth. Ground was water charged |
![]() |
Lingyen Mountain Temple, Berala Foundation Piers CFA Piers 600 - 450 diam to 9m depth |
![]() |
Shelly Beach SLSC, Shelly Beach Foundation Piers CFA Piers 600 diam to 11.5m depth |
Dungog Water Treatment Plant Foundation Piers for Thrust Blocks Raked Bored Piers at 10o (sleeved). Ground conditions encountered rock to 50mpa (2m socket)
|